Skip to main content
(866) 858-3867
Get a Free Quote

Cleanup Project Planner

Planning a renovation, cleanout, or demolition project? Tell us what you are working on and we will build a personalized cleanup plan, including the right dumpster size, a realistic timeline, and a step-by-step preparation checklist.

Cleanup Project Planner

Tell us about your project and we will build a cleanup plan with dumpster recommendations, timeline, and a preparation checklist.

How many rooms or distinct areas are involved in this project?

How many days do you plan to spend on this project?

Tips for a Smooth Cleanup Project

The most common mistake people make with cleanup projects is underestimating the amount of debris. A single room renovation can easily fill a 10-yard dumpster, and a whole-house cleanout can require 30 yards or more. The planner scales a typical debris volume for your project type by the number of rooms.

Timing matters too. Schedule your dumpster delivery for the first day of your project, not the day you expect to finish. Having the container on-site from the start lets you toss debris as you work instead of creating piles that need to be moved later. Most rentals include a standard 7-day period, which is enough for most single-room projects.

Before your dumpster arrives, complete the preparation checklist above. Clearing the delivery area, disconnecting utilities, and sorting items ahead of time will save you hours of work once demolition begins. And remember: donate what you can. Many items in good condition can go to Habitat for Humanity ReStores, Goodwill, or local charities instead of the landfill.

Cleanup Planning Questions

Pick your project type and the number of rooms or areas in the planner above. It estimates the loose volume of debris and recommends the smallest dumpster that holds it. A single-room remodel usually fits a 10 or 15 yard; a whole-house cleanout often needs a 20 or 30 yard.

Answered by Michael V., Head of Operations

Roofing goes in a 10, 15 or 20 yard dumpster, sized by the volume of shingles. Shingles are heavy, so a load can go over the included tons; extra weight is billed per ton and never changes the box size. Large roofs get more than one 20 yard.

Answered by Michael V., Head of Operations

Most rentals include 7 days, which covers most single-room projects. Have the dumpster delivered on the first day of work, not the last, so you can load as you go. Extra days can be added if the project runs long.

Answered by Joe Woods, Commercial & National Accounts Specialist

Keep them separate. Clean concrete, brick and dirt go in a 10, 15 or 20 yard heavy box at a flat price, with included tons equal to the yards. Mixing them with household or construction debris makes the load much heavier.

Answered by Joe Woods, Commercial & National Accounts Specialist

Get Your All-Inclusive Price Today

One call. One price. Zero surprises. Get a real quote in minutes from one of America's highest-rated dumpster & site-service companies.

  • No obligation
  • Same-day available
  • No hidden fees

Get my instant price

Enter your ZIP. See availability & pricing in seconds.

or call now
Ultimate Dumpsters live agent on a headset, ready to take your call

Live agents standing by

Real people answer, no phone trees

Licensed & Insured 2,200+ Google reviews Mon-Sat support
Call Now: (866) 858-3867