Chain-Link Panel Fencing: The Standard for Site Security
Chain-link panel fencing is the temporary fence you picture around a construction site: 6-foot galvanized panels standing on weighted bases, so nothing gets drilled or dug on your property. It is the only temporary fence type that acts as a real security barrier, with lockable gates, and the crew installs it, moves it when your project changes, and removes it at the end.
Quoted flat to your exact perimeter in one call. Mon-Sat, 7 AM-7 PM your local time.

Panel Fencing Specs
What actually shows up on your site. Every rental includes professional installation and removal by the crew.
| Panel height | 6 feet standard, 8 feet available for enhanced security |
| Material | Galvanized chain-link with a top horizontal rail for rigidity |
| Anchoring | Weighted bases (concrete blocks or rubber feet), no ground penetration |
| Gates | Swing gates from 4-foot pedestrian widths to 20-plus feet for vehicles |
| Add-ons | Privacy screen, windscreen, and barbed wire topping |
| Minimum rental | One month, then month to month |
- Professional installation and teardown by the crew, included in the quote
- Weighted bases mean no digging, no anchoring, no surface damage
- Locking gate hardware for after-hours security
- Line moves, panel swaps, and repairs handled with one call
Three Ways Sites Run Panel Fencing
Same panels, three configurations. All quoted per project with the add-ons itemized before anything goes up.
Standard Panels
Construction perimeters, vacant lot security, equipment yards
The baseline configuration: 6-foot galvanized panels, braced and leveled on weighted bases, with lockable gates where you need them.
With Privacy Screen
Residential areas, dust control, visual barriers
Fabric screen attached to the same panels blocks sightlines and knocks down dust. The go-to for demo work near neighbors.
With Barbed Wire
High-security sites, theft prevention
Barbed topping on the same panel line for sites storing tools, copper, or equipment overnight. Quoted as an add-on, up front.


How Panel Installation Works
Three steps, and the crew does the heavy two. Most sites are fully fenced within one business day.
Measure & Quote
Give us the perimeter footage, even roughly. We convert it to a panel count, place the gates where your trucks enter, and quote one flat rate.
Crew Installation
Panels set, leveled, and braced on weighted bases, gates hung with locking hardware, screen attached if ordered. A 200-400 foot site takes 4-6 hours.
Moved, Then Removed
Phases change? One call moves the line. When the project ends, the crew removes everything, bases and all, and leaves the surface unmarked.
What Your Site Needs
- Any surface: concrete, asphalt, gravel, or grass
- A clear path along the fence line for the install crew
- Gate locations decided before install day
- A permit if the line touches public property (we help you check)
When to Choose Panels Over Mesh or Barricades
Honest answer: panels are the only one of the three that actually secures property. If you just need a visible boundary, mesh is cheaper. If you are steering a crowd for a day, barricades are the tool.
| Chain-Link Panel (this page) | Mesh Fencing | Steel Barricade | |
|---|---|---|---|
| Best for | Site security, construction perimeters | Boundaries, hazard zones, erosion control | Crowd control, event lines |
| Height | 6 feet (8-foot available) | 4 feet | Waist-high sections, 6-8 ft long |
| Anchoring | Weighted bases on any surface | Steel T-posts or drive-in stakes | Interlocking flat feet, freestanding |
| Security level | Real barrier with lockable gates | Visual boundary, not a barrier | Guides people, not a barrier |
| Minimum rental | One month | One month | One day |
| Who sets it up | Installed and removed for you | Installed and removed for you | Typically self-positioned after delivery |
Full pages on the siblings: mesh safety fencing and steel barricades, or the temporary fencing overview.
Panel Fencing Pricing
Chain-link panel fencing is quoted per project: your linear footage, the gates, add-ons like privacy screen or barbed wire, and how long the fence stays up, in one all-inclusive number. Installation and removal are always in the quote, and long-term rentals of six months or more receive discounted rates. Call (866) 858-3867 for your number, or see how fencing pricing works.
Panel Fencing Questions, Answered by the People Who Install It
Real answers from our operations and commercial desks. If yours isn't here, the phone gets you a person, not a menu.
Our standard panels are 6 feet tall, which is the most common height for construction sites and the one most building codes expect. 8-foot panels are available when a site needs enhanced security. Every panel is topped with a horizontal rail for structural rigidity, so the line stays straight instead of sagging between posts.
Answered by Michael V., Head of Operations
No. The panels stand on weighted bases, concrete blocks or rubber feet, so nothing gets drilled and no post holes get dug. That is what lets us install on concrete, asphalt, gravel, or grass and leave zero marks when the fence comes down. On soft ground we can drive stakes, and in high-wind areas we add sandbags to the bases.
Answered by Michael V., Head of Operations
Most perimeters are installed within one business day. A standard construction site of 200-400 linear feet typically takes the crew 4-6 hours, and very large or complex layouts can take two days. We schedule around your project, so if the site opens Monday, the fence goes up before it.
Answered by Michael V., Head of Operations
Yes. Swing gates run from 4-foot pedestrian widths to 20-plus feet for vehicles, with matching chain-link, hinges, and secure latch hardware for after-hours locking. My advice: place the gates where the trucks will actually enter, not where the site plan looks tidy. Gate placement can be adjusted during your rental, but getting it right before install day is free.
Answered by Michael V., Head of Operations
One month, then billing continues month to month for as long as the project runs. Long-term rentals of six months or more receive discounted rates, and if you are fencing multiple sites or phases, tell me the whole picture and I will quote it as one program instead of a stack of one-off rentals.
Answered by Joe Woods, Commercial & National Accounts Specialist
The crew, both directions. Installation is part of the quote: panels set, leveled, braced, bases weighted, gates hung. And when the project wraps, the same crew takes everything down, bases and all, and leaves the site clean. You never touch a panel, and removal is included in the number you were quoted.
Answered by Michael V., Head of Operations
One call. As phases change the crew moves the line, adds panels, or pulls a section for equipment access, and if a panel gets damaged we repair or swap it. Do not have your own crew drag panels around: a line rebuilt by hand stops being straight, braced, or secure, and that is when things walk off sites.
Answered by Michael V., Head of Operations
Yes, and it is where we do our best work. One point of contact, one consolidated quote, and crews scheduled across every site as phases open and close. If you are ordering fence left and right across projects, I guarantee I save you some money.
Answered by Joe Woods, Commercial & National Accounts Specialist
Real Reviews From Real Orders
Rated 4.3/5 across 2,238 Google reviews of our locations. Check them yourself, they're public.
Ultimate dumpsters Brooklyn and ultimate dumpsters Staten island always come through whenever we need a roll off dumpster in either city.
Rented a dumpster from Ultimate Dumpsters while clearing out my dads old garage and holy crap we had way more junk than I thought 😂. Delivery guy was cool as hell and even helped me figure out the best spot to put it. P...
Visited some family in Staten Island, needed to do an estate clean out. Mike and the Ultimate Dumpster Staten Island team got us a 30 yard container same day and picked up on Saturday when we were leaving town. Great ser...
Get Your Perimeter Quoted Flat
Tell us the footage, the gates, and how long it stays up. One flat number, installation and removal included, in one call.
